demo-epb/docs/plans-md/RM-Plan.md
T
Stefan Lohmaier fb2c083551
Validate / build-test (macos-latest) (push) Failing after 3s
Validate / build-test (windows-latest) (push) Failing after 15s
Validate / build-test (ubuntu-latest) (push) Successful in 17s
Validate / reports (push) Successful in 50s
Release / release (push) Successful in 50s
feat(i18n): full English translation of demo-epb
Phase 2 of the English translation:

Word documents (filled, EPB-specific):
- 8 plans (PID, PM, QA, SWE, Test, Project Manual, CM, RM)
- 6 safety docs (HARA, Safety Case, FMEDA, MISRA Compliance,
  Verification Report, Tool Qualification Cppcheck)
- 2 manuals (User, Service)
- 3 audit artefacts (Review minutes, NC-001, MISRA-REC-001)
- All regenerated via pandoc from English markdown sources

Code, tests, headers:
- All file headers, struct comments, function docstrings in English
- All test names (TEST_BEGIN strings) translated
- Inline comments translated
- 46 tests still green after translation

CI workflows:
- All step names in English
- Step descriptions, comments, release notes template in English

README.md fully rewritten in English with proper guided tour.

Phase 3 (still pending): dev-process repo templates + toolstack/setup docs.
2026-05-12 03:37:51 -07:00

5.0 KiB
Raw Blame History

doc-id, version, status, date
doc-id version status date
SLM-EPB-RM-001 1.0 Released 2026-05-12

Risk Management Plan (RM Plan)

Field Value
Project demo-epb
Document ID SLM-EPB-RM-001
Version 1.0
Status Released
Date 2026-05-12
Standard ASPICE MAN.5

1. Purpose

Identifies, assesses, and treats project risks (organisational, technical, schedule, resource). Distinct from functional safety risks (hazards), which live in the HARA.

2. Methodology

Step Activity
1. Identification Workshops, lessons learned, stakeholder input
2. Classification Probability (P) × Impact (I)
3. Assessment Risk score = P × I (1-25)
4. Treatment Avoid / Mitigate / Accept / Transfer
5. Monitoring Quarterly review, status updates

2.1 Classification scale

Probability Meaning
1 Very unlikely
2 Unlikely
3 Possible
4 Likely
5 Very likely
Impact Meaning
1 Negligible
2 Minor delay / additional effort
3 Noticeable impact on schedule/budget
4 Significant impact, project at risk
5 Project stop
Score range Action
1-4 Accept, monitor
5-9 Mitigate (plan)
10-15 Mitigate (immediate, with escalation)
16-25 Escalate to Project Owner

3. Risk register

ID Description P I Score Treatment Status
R-01 Demo is mistaken for production-ready code 3 3 9 Disclaimer in README + Project Manual Mitigated
R-02 MISRA tooling update breaks CI (false positives) 2 3 6 Pin tool versions, regression suite Mitigated
R-03 Reviewer availability for ASIL-D 3 4 12 Self-review documented (demo only) Accepted (demo)
R-04 Gitea server outage 2 4 8 Local clones, regular backups Mitigated
R-05 Apple certificate expiry without warning 3 3 9 Renewal reminder + 30-day notice Mitigated
R-06 Windows build VM unreliable (busybox-PATH conflicts) 4 2 8 MSYS2 documented, alt PATH ordering Open
R-07 macOS act_runner host-mode cache bug 3 2 6 continue-on-error, documented Open
R-08 Doorstop tool compatibility on upgrade 2 3 6 Own traceability.py, no doorstop dep Mitigated
R-09 Knowledge loss with single-person setup 4 4 16 Maintain Project Manual + documentation Open

4. Risk reviews

Frequency Participants Outputs
Quarterly Project Owner + TL Updated register, action items
On change Affected roles Risk score update
At release Project Owner + QA Residual-risk assessment

5. Escalation path

Risk owner (daily)
   │  Score > 9
   ▼
Project Owner (weekly)
   │  Score > 15
   ▼
Stakeholder / Client (immediately)

6. Lessons learned

Closed risks are summarised at project closure under docs/lessons-learned/, to better assess follow-up projects.

  • PM-Plan.docx — Top-level risks (summary)
  • HARA.docx — Functional safety risks (hazards, separate from project risks)
  • QA-Plan.docx — Non-conformity management

8. Revision history

Version Date Change Author
1.0 2026-05-12 First release S. Lohmaier