Files
dev-process/templates-de/projekt/PID-vorlage.md
T
Stefan Lohmaier 8ea3f3d8f4 templates-de: German document templates, moved in from ownCloud
The 25 files under templates-de/ lived in ~/ownCloud/Persönlich/slohmaier.com/vorlagen/
with no version control. They are the German-language counterpart of the
templates renamed to English in 247b831 — this repo already describes itself as
holding the ASPICE 4.0 / ISO 26262 methodology, templates and tools, so a
second home for templates would have been a duplicate.

Structure preserved as found (business/, engineering/, projekt/, qualitaet/).
No file renamed, no template content changed.

Not moved: vorlagen/slohmaier-doc-template.docx was byte-identical (MD5
31b2d0748eadf0314babf469725ee0b1) to templates-word/slohmaier-doc-template.docx
already in this repo.

Path references fixed in templates-de/README.md, which pointed at locations
that no longer exist: the ownCloud cp examples now clone from Gitea, the
generator script name follows the vorlagen/ -> templates/ rename
(generate_word_vorlagen.sh -> generate_word_templates.sh), the edit workflow
names templates/ and templates-de/ instead of the removed ownCloud copy, and
the master template is referenced at ../templates-word/.
2026-07-31 09:55:33 +02:00

4.4 KiB

Project Initiation Document (PID)

Feld Wert
Projektname [Name]
Auftraggeber [Firma / Ansprechpartner]
Auftragnehmer Stefan Lohmaier
Datum [YYYY-MM-DD]
Version [1.0]
Status [Entwurf / Freigegeben]

1. Projektziel

[Was soll erreicht werden? Ein bis drei Saetze.]

2. Scope

In Scope

  • [Lieferumfang Punkt 1]
  • [Lieferumfang Punkt 2]

Out of Scope

  • [Was explizit nicht enthalten ist]
  • [Abgrenzung zu anderen Teilprojekten]

3. Randbedingungen

Randbedingung Beschreibung
Zielplattform [z.B. ARM Cortex-R5, Renesas RH850]
ASIL [QM / A / B / C / D]
Normen [ASPICE 4.0, ISO 26262:2018]
Programmiersprache [C / C++ / Rust]
Coding Standard [MISRA C:2012 / MISRA C:2023]
Laufzeitumgebung [Bare-Metal / AUTOSAR Classic / Linux]
Kundenvorgaben [Spezifische Anforderungen des Kunden]

4. Lieferergebnisse

Nr. Lieferergebnis Format Termin
1 Software Requirements Specification GitLab Issues [Datum]
2 Architektur-Dokumentation GitLab Wiki [Datum]
3 Quellcode Git Repository [Datum]
4 Unit Tests + Coverage Report CI-Artefakt [Datum]
5 MISRA Compliance Report CI-Artefakt [Datum]
6 Testbericht Markdown/PDF [Datum]
7 Release-Paket Git Tag + Artefakte [Datum]

5. Meilensteine

Meilenstein Datum Kriterium
Projektstart [Datum] PID freigegeben
Requirements Complete [Datum] Alle Anforderungen reviewed
Architecture Complete [Datum] Architektur reviewed und freigegeben
Code Complete [Datum] Implementierung abgeschlossen, Tests gruen
Verification Complete [Datum] Coverage-Ziele erreicht, MISRA compliant
Release [Datum] Alle Exit-Kriterien erfuellt

6. Risiken (initial)

ID Risiko Wahrscheinlichkeit Auswirkung Massnahme
R-01 [Risikobeschreibung] [H/M/L] [H/M/L] [Gegenmassnahme]
R-02 [Risikobeschreibung] [H/M/L] [H/M/L] [Gegenmassnahme]

7. Beteiligte Rollen

Rolle Person / Organisation Verantwortung
Projektleiter Stefan Lohmaier Gesamtverantwortung
Software-Entwickler Stefan Lohmaier Implementierung, Unit Tests
QA-Verantwortlicher [Name / extern] QA-Aktivitaeten, Audits
Safety-Verantwortlicher [Name / extern] ISO 26262 Compliance
Reviewer [Name / extern] Code- und Dokument-Reviews
Auftraggeber [Name] Anforderungen, Abnahme

8. Freigabe

Rolle Name Datum Unterschrift / GitLab-Verweis
Auftragnehmer Stefan Lohmaier [Datum]
Auftraggeber [Name] [Datum]

Aenderungen an diesem Dokument werden im GitLab-Wiki versioniert.